TECHNOLOGY
TECHNICAL CHARACTERISTICS
- 100G technology proof since 2016
- Secure monitoring with a NOC (Dakar) and a BNOC (France)
- PoP-to-PoP connection providing access to major cities in Europe and Africa (Paris, Telvent, Cape Town)
-
System Latency (RTT in ms) Paris –
Le Cap = 145
Lisbon – Le Cap = 135
- DESIGN CAPACITY 12.8Tbps
- LIT CAPACITY 1.6Tbps
- Future proof upgradability Longest DLS = 4400 km (Penmarch - Dakar) Able to adopt newer transponder technology
NEWS
![](https://i0.wp.com/ace-submarinecable.com/wp-content/uploads/2021/10/0-4-1024x768-1.jpg?fit=300%2C225&ssl=1)
Guinea Bissau soon connected to ACE submarine cable – ACE Submarine Cable
10 November 2021
No Comments
Read more »
![](https://i0.wp.com/ace-submarinecable.com/wp-content/uploads/2021/10/0.jpg?fit=300%2C153&ssl=1)
![Carte New](https://i0.wp.com/ace-submarinecable.com/wp-content/uploads/2022/02/Carte-png-2.png?fit=267%2C300&ssl=1)
The ACE Cable system now connects Europe, West Africa and South Africa.
12 August 2021
No Comments
Read more »