TECHNOLOGY
TECHNICAL CHARACTERISTICS
- 100G technology proof since 2016
- Secure monitoring with a NOC (Dakar) and a BNOC (France)
- PoP-to-PoP connection providing access to major cities in Europe and Africa (Paris, Telvent, Cape Town)
-
System Latency (RTT in ms) Paris –
Le Cap = 145
Lisbon – Le Cap = 135
- DESIGN CAPACITY 12.8Tbps
- LIT CAPACITY 1.6Tbps
- Future proof upgradability Longest DLS = 4400 km (Penmarch - Dakar) Able to adopt newer transponder technology